Thursday, May 9, 2013

HabitMaster: Alpha release

HabitMaster is now live in the wild. You can see the new one-page HabitMaster project site that links to everything else you might want to see, including a running Heroku instance.

Overall, this deadline has been met with limited success. I'm calling this an alpha release because the HabitMaster achievements (in other words, the actual gamification parts!) are still unimplemented. It means HabitMaster is just a basic habit tracker right now, and still a little rough around the edges at that.

This has mostly been due to just slow progress. According to my time tracker, I averaged around 8 hours a week on ICS691 projects for most the semester. I stepped that up to averaging around 12 hours a week for the past month, but I still don't appear to have much to show for it. Yet it seems all of my implementation projects go this way: I continue to underestimate just how much code is required to do things.

I spent most of my time implementing back-end details, such as streak detection given a list of activities and a particular schedule type. I was excited to use a Python generator (basically a fancy iterator) to good effect there.

I also came up with a workable solution to handling polymorphism in database objects. Specifically, my habits link to a Schedule object, but there are two subtypes of Schedule: DaysOfWeekSchedule and IntervalSchedule. Grabbing habit.schedule would give me a row from the Schedule table, which was fairly useless. I ended up adding a cast() method to Schedule that would resolve that instance to the proper subtype for me.

Django's unittest framework was very handy. I didn't get into the UI unit tests that actually let you test requests and responses, though. I would like to explore that more. I'm still impressed with Django and its documentation.

I picked up more HTML5 tags, which has been enjoyable. I dig all the semantic tags they have now. Twitter Bootstrap and CSS design in general was a time drain, though. There was a lot of fidgeting required to get everything laid out right. I'm still a lousy graphical designer. CSS still trips me up on things that seem like they should be easy, such as define a DIV of a given relative width and then align a couple items to the left and one or two to the right within that DIV. And then have them all play nicely as the window resizes. I will say that Bootstrap helped compared to trying to do this from scratch in CSS, though.

GitHub (and to a lesser extent Heroku) has been an increasing pleasure to use. I put GitHub Pages and GitHub's wiki, issues, and milestone features to work on this project. I code alone so often that I've developed some lazy git practices, though. The main one is that my commits are based on work-session rather than issue. It doesn't affect anyone else, but it means I often commit things half-done or in a broken state. That is going to come back to haunt me if I ever have to rollback to a previous verison. I also have a lot yet to learn about merging and pulling with git. I ran into a bit of that while I was editing on Windows, Linux, and through the GitHub web interface today.

As you can probably tell, I enjoyed all the technical learning this project has afforded me.

Regarding the gamification aspects, I have this lesson to share: It takes a lot of time. Any gamification mechanics will be in addition to implementing the underlying service you want to provide. The gamification needs to be well-thought out, too. If possible, leveraging an existing framework could help cut down on that time... though it means you'll need to spend the time learning the framework and then being bound by its limitations.

The other thing that HabitMaster has clarified for me is the difference between gamification and a serious game. I see HabitMaster as an example of the former but not of the latter. To me, gamification means being inspired in your design by the fun and rewarding engagement we find in games--even when you're designing something that is clearly not a game. Because it's not a game, you can't just paste game mechanics onto your service. You need to think about the experience you're going for... which brings us to deeper concepts like mastery, autonomy, meaning, flow, engagement, reward, and the like. A serious game, on the other hand, is when you take something that is clearly a game and try to graft non-game goals or outcomes on to it.

HabitMaster will likely be dormant for a little while as I finish up some other pressing projects, but I do hope to resume development when I get some time. I'll also be starting a new teaching job in July. I wonder if I might bring some gamification to bear on course design there.


Tuesday, December 13, 2011

Group Programming: Some Adjustment Required

After last week's technical review, Jeff and I swapped projects with the grads group. That is, we took over on the grads' code, and they started working on ours. Both groups added three more commands to the existing codebase that they had just inherited.

This was an interesting experience taking over on an existing software project. Of course, there was some initial overhead getting familiar with the layout of the new project's code. This wasn't too onerous, though, since the overall structure was fairly logical.

Once Jeff and I started working, the work went smoothly. We had already completed one project together. I think Jeff and I communicated well, and each of us made some significant contributions. We agreed on all of the major design issues.

Still, for all of the harmony, I'd say that my most interesting learning experience this week was the old "pick your battles" experience. If you've ever shared a living space with someone as an adult--whether a college roommate or a romantic partner--you probably know what I mean. There's a period of adjustment to the person's habits and quirks. For example, maybe your new roommate already put the silverware in the left drawer when you feel that it is obviously more natural to have it in the right drawer. Or maybe your new lover seems to somehow constantly drop loose change; eventually stray coins lie scattered throughout the house.

For each new quirk you discover, you have to decide whether it bothers you or not. If it does, then you need to figure out if you're willing to just overlook it, constantly clean up after them, or make an issue of it. If you make an issue of every little thing, you can easily become an unpleasant nag. Depending on how it's done, cleaning up behind someone can come across as a passive-aggressive show of disapproval. But, if something really does bother you and you don't speak up, you can find that your living space is not really your own. That's what I mean by picking your battles.

First, Jeff and I had to come to terms with the existing code. As we settled in, we found we had to "move the silverware" in a few places to meet our tastes. In particular, we overhauled the look and behavior of the user interface. We left the reflection-based loading of classes in place, though.

Then there were the minor differences in working style that I noticed between me and Jeff. For the most part, these were so minor as to border on petty: "If I'd done it, I wouldn't have spaced the output that way" or "I usually write one class at a time rather than mock up all the classes and then fill in the details later."

A couple weeks ago, I mentioned the motivating aspect of working in a group. My point this week is that, whenever you work with someone else, they are not going to do things exactly the same way you do. That is to be expected. But, even when you realize this consciously, each specific difference you discover can still cause a short pause: "Oh.. that's not how I would have done that... but that doesn't mean it's wrong... Am I going to accept how this has been done and move on, or do I want to say something and change it?" Overall, I discovered that I could just let these things go. It was just a new experience for me to adjust to someone else's presence in my coding project space, both in terms of the old code and the new.

Jeff and I got everything finished up before the deadline. I think our code is pretty solid, though some of our line-spacing might be a little off between different commands.

Testing code that connects to a server continued to be a pain. I considered making some sort of mock client object, but there proved to be too many methods that would need to be overridden to make it worthwhile.

I also found that, when verifying someone else's code, it's easier to run through a manual test rather than plod through all their JUnits and make sure it covers all the necessary cases. While I think it's good to get some manual testing in there occassionally--especially since that lets you spot things like typos and weird formatting that a JUnit test is not going to catch--I think this is still not quite ideal. Manual testing can find bugs that the person's JUnits missed. But, if the code is correct, manual testing won't reveal that an appropriate JUnit test is missing altogether. This means that changes to the code could cause an undetected failure later. So I guess I should work on using the person's JUnit tests as a loose guide to manual testing in order to spot missing/poor tests as well as any existing defects.

I'm still a fan of Issue-based Project Management. I'm also glad we kept our habit of having the other person mark completed tasks as Verified. It's an extra step, but it's a good feeling knowing that everything has been double-checked by someone else.

This is the last project for my software engineering course, so it may mean a blog hiatus for a while. But I should be back occasionally with news on other new software projects!

Saturday, November 26, 2011

Group Programming and Issue-based Project Management

I spent the last couple weeks doing some group-based programming on a small WattDepot project. The project was to build a command-line interface that lets a user poll the energy data collected from one of the dorms on the University of Hawai'i--Manoa campus. Different commands allow the user to see the current power consumption of a dorm tower or lounge, to rank the different dorm towers by energy consumed over a given time period, to see the energy use of a tower or lounge for a given day, or to see the total energy consumed by a tower or lounge since a given date.

I haven't done any group programming in about 10 years, but I found the return to it quite enjoyable. I find it motivating to know that someone else depends upon and is eagerly awaiting my changes. I found myself prioritizing this project over my other projects to make sure I wasn't holding someone else up.

Our group consisted of only two programmers. We used Google Project Hosting's issue-tracking system to manage the project. We met occasionally to map out the course of the project, and we would create new issues for tasks that needed to be done. Then one of use would accept responsibility for the task and work on it. Once it was done, the other person would look over it and mark the issue as verified. Since the different issue pages allow for threaded discussion, I found this is a good way to track the progress of the project. It was also very easy to link from source code commit logs to the relevant issues and also back from an issue to those commits that solved it.

We happened to worked in shifts, and so we never had to deal with a code merge. I'm a little disappointed I haven't had a chance to experience this yet.

We also used continuous integration. That means we had a Jenkins server setup that independently verified that each commit to the Google repository still compiled successfully and passed all tests and QA checks. This was a comfort. After a commit, I'd always wait a few minutes to make sure I didn't receive an email from Jenkins. When I didn't, I felt more confident signing off for the night.

Our project was plagued with external problems, though. I had to make a emergency 5-day trip back to the mainland for a funeral during the middle of the project. My partner, Jeff, broke his leg around the same time. Besides being on painkillers after that, he wasn't able to drive to campus. So we only had one initial face-to-face meeting, but we compensated with a couple phone meetings and nearly-daily overview emails in addition to the issue-tracking threads. Near the end of the project, the WattDepot server went down, which halted production and then broke all of our test cases. This meant that our build appeared broken for about 3 days while we waited for the new server to generate enough data for us to work with.

All this planning and coordination certainly did come with an overhead. I'd say this project took 2 to 3 times longer than if we'd just done the project independently. But, like I said, I found the group atmosphere quite motivating, and it probably helped to have a couple pairs of eyes look over all the code.